CATALYST PLATFORM · LIVE DATA
FY2026 · Q14 FACILITIES ACTIVE
FACILITIES

Stavanger Refinery

F01

Rotterdam Cracker

F02

Gdańsk Port Fleet

F03

Kiel Assembly Plant

F04

REDUCTION WATERFALL · tCO₂e−62% TO TARGET
NET ZERO 2027
FACILITY DETAILOPTIMAL

FACILITY

Stavanger Refinery

SCOPE 1

14,200 tCO₂e

YoY CHANGE

▼ 23%

CARBON INTENSITY28/100

RECOMMENDED ACTIONS

Fuel switch: NG → H₂
CCS pilot: Unit 3
Scope 2 PPA review
VENTURE-STAGE · ENTERPRISE GRADE

THE OPERATING SYSTEM
FOR INDUSTRIAL
DECARBONIZATION.

Ingest emissions telemetry from any source. Model reduction pathways across 47 certified abatement levers. Produce audit-ready regulatory reports for CSRD, SEC Climate, and ISO 14064 — without approximations.

SYSTEM SPECIFICATION SNAPSHOT

INGESTION THROUGHPUT2.4M data points / hr
ABATEMENT PATHWAYS47 certified levers
REGULATORY FRAMEWORKS11 (CSRD · SEC · ISO + 8)
DEPLOYMENT TIME14 days to production
DATA RESIDENCYEU · US · APAC regions

FOUR MODULES.
ONE SYSTEM.

Each module ships with full API documentation, integration SDKs, and reference architectures. No professional services required for standard deployments.

MOD-01 · EMISSIONS INGESTION

Data Acquisition Layer

PRODUCTION READY

Ingest raw emissions telemetry from any industrial source. Schema-agnostic ingestion handles heterogeneous plant architectures without custom ETL work.

KEY METRIC2.4M data points / hr
PROTOCOLSREST API · MQTT · OPC-UA · Modbus
ERP CONNECTORSSAP S/4HANA · Oracle ERP · Infor
THROUGHPUT2,400,000 data points/hr sustained
LATENCY< 120ms ingestion-to-ledger
FORMATSJSON · CSV · ISO 14064-3 XML · PACT
AUDIT TRAILImmutable hash-chain, SHA-256

MOD-02 · REDUCTION MODELING

Scenario Engine

ENTERPRISE

Monte Carlo–based scenario modeling across 47 certified abatement pathways. Quantify reduction potential before committing capital.

KEY METRIC47 abatement pathways
METHODOLOGYMonte Carlo · GHG Protocol · PCAF
PATHWAYSCCS · Fuel switch · Electrification · DAC
SCENARIOSUnlimited concurrent runs
CONFIDENCEP10 / P50 / P90 output bands
CAPEX MODELINGIRR · NPV · Payback period
BENCHMARKSIEA NZE · SBTi 1.5°C · IPCC AR6

MOD-03 · REGULATORY MAPPING

Compliance Intelligence

AUDIT-READY

Automated cross-mapping to active and forthcoming disclosure frameworks. Reports generated to regulator specification — not approximation.

KEY METRIC11 frameworks covered
EU FRAMEWORKSCSRD · EU ETS · CBAM · SFDR
US FRAMEWORKSSEC Climate Rule · EPA GHGRP
INTERNATIONALISO 14064 · TCFD · CDP · GRI 305
OUTPUT FORMATStructured XML · XBRL · PDF/A-3
AUTO-UPDATEFramework changes pushed ≤ 72hr
ASSURANCEBig-4 audit-compatible data rooms

MOD-04 · CAPITAL ALLOCATION

Abatement Cost Optimizer

CFO-GRADE

Rank every reduction lever by $/tCO₂e removed. Allocate decarbonization budget where marginal abatement cost is lowest — not where it is most visible.

KEY METRIC< $18/tCO₂e avg. identified
COST CURVEMarginal abatement cost by lever
INTEGRATIONSAP FI · Bloomberg ESG · Refinitiv
CARBON PRICEEUA futures · RGGI · CCA live feeds
PORTFOLIO VIEWCross-facility capital ranking
SENSITIVITYPrice shock analysis ±$50/tCO₂e
REPORTINGBoard-ready one-pager export

FROM SENSOR TO BOARD REPORT IN A SINGLE SYSTEM

01 · FACILITY SOURCES

Raw telemetry

IoT SensorsSCADAERP Export
↓
02 · INGESTION LAYER

Schema normalization

API GatewayMQTT BrokerValidation
↓
03 · EMISSIONS LEDGER

Immutable record store

Hash-chainISO 14064-3Versioned
↓
04 · SCENARIO ENGINE

Reduction modeling

Monte Carlo47 PathwaysCAPEX Model
↓
05 · COMPLIANCE OUTPUT

Regulator-ready reports

CSRDSEC RuleXBRL Export

AVERAGE TIME-TO-FIRST-INSIGHT: 4 hours post-connector setup

Download Integration Architecture PDF
3.2BtCO₂e

Emissions Processed

Across active deployments

214FACILITIES

Industrial Sites Onboarded

Refineries · Factories · Fleets

11FRAMEWORKS

Regulatory Frameworks

CSRD · SEC · ISO 14064 · CDP + 7

< 4hrTIME-TO-INSIGHT

From Connector to Dashboard

Median across enterprise deployments

$18/tCO₂e AVG

Marginal Abatement Cost

Identified by capital optimizer

EVERY FRAMEWORK.
ZERO APPROXIMATIONS.

Ingestion
Modeling
Compliance
Capital
FRAMEWORKREGIONTYPEDEADLINEMODULES USED
CSRD
EU
Mandatory Disclosure
FY2025 reports
IngestionModelingCompliance
SEC-CR
US
Mandatory Disclosure
FY2026 (large accelerated)
IngestionCompliance
ISO-14064
INT
Verification Standard
—
IngestionCompliance
EU-ETS
EU
Cap & Trade
Annual surrender
IngestionCapital
CBAM
EU
Trade Compliance
Full scope 2026
IngestionCompliance
TCFD
INT
Voluntary / Embedded
—
ModelingCompliance
SBTi
INT
Target Validation
—
ModelingCapital
CDP
INT
Investor Disclosure
—
IngestionCompliance

Framework library updated within 72 hours of regulatory amendments. Auto-push to all active tenants. No manual intervention required.

QUALIFIED ENTERPRISE LEADS ONLY

REQUEST A
TECHNICAL DEMO

A Catalyst solutions engineer will walk through your facility data architecture, map your regulatory deadlines, and model one reduction scenario live — using your numbers, not a generic dataset.

Live ingestion demo with your data source type
Scope 1–3 baseline estimate in 20 minutes
Regulatory gap analysis vs. your current reporting
Marginal abatement cost curve for 3 pathways

WORK EMAIL REQUIRED · NO PERSONAL ACCOUNTS · ENTERPRISE ONLY

SECONDARY PATH

SELF-SERVE TECHNICAL EVALUATION

DOWNLOAD THE
INTEGRATION ARCHITECTURE PDF

32-page technical specification covering connector schemas, API endpoints, data models, security architecture, and reference deployment topologies for SAP, Oracle, and greenfield environments.

FORMAT

PDF/A-3 · 32 pages

INCLUDES

API schemas, ERD, Security model

AUDIENCE

IT architects, Integration leads

UPDATED

Feb 2026 · v4.2

WORK EMAIL REQUIRED · USED ONLY TO DELIVER DOCUMENT

SOC 2 Type II
ISO 27001
GDPR Compliant
EU Data Residency

AVERAGE ENTERPRISE ONBOARDING: 14 DAYS